ICN Gateway Major Projects and Opportunities |
|
Number of work packages : 40
The ARM Hub is an agile world-leading technology centre in robotics and design-led manufacturing. Headquartered in Brisbane, the ARM Hub provides access to the most tightly woven network of research institutions, facilities and smart commercial companies in the region.
Number of work packages : 34
The AIR555-1 Airborne Intelligence, Surveillance, Reconnaissance, Electronic Warfare (AISREW) Facilities Project is being delivered by the Capital Facilities and Infrastructure (CFI) Branch of the Department of Defence. The Project will support the introduction into service of MC-55A (modified Gulfstream 550) which will be procured by Capability Acquisition and Sustainment Group (CASG).
Number of work packages : 9
AIR6500 Phase 1 Joint Air Battle Management System (JABMS) will form the core architecture of the future ADF
Integrated Air and Missile Defence (IAMD) capability to improve the accuracy and speed of ADF systems’
response to air and missile threats in the future (2025+,) in order to protect deployed forces whilst increasing levels
of interoperability with Coalition partners. JABMS will ensure that future ADF IAMD capabilities will have the
flexibility for further enhancement to handle more complex threats that may emerge in the future.
Number of work packages : 15
Australia’s Defence Department will procure a sophisticated Command, Control, Communications, Computer and Intelligence (C4I) system to fuse information from multiple sources. This will enable coordination of military forces and a more timely operational response, providing the comprehensive situational awareness required for integrated air and missile defence of the nation.
Number of work packages : 30
Airbus is seeking to grow its Space portfolio in Australia and New Zealand, integrating the capability and skill of local companies into its success.
Number of work packages : 13
Amentum is a premier, global government and private-sector partner whose experience, passion and purpose drive mission success.
Number of work packages : 12
The objective of the Aquila Project (Project) is to convert the previous Aquila bord and pillar mine located at the Capcoal mining complex in Central Queensland’s Bowen Basin, to a longwall operation. The Project aims to deliver a medium seam longwall operation targeting the Aquila and Aquila Lower coal seams to produce hard coking coal.
Number of work packages : 1
APA Group is one of Australia’s leading energy infrastructure businesses, owning and operating the largest interconnected gas transmission network across the country.
Number of work packages : 15
Arrow Energy is currently exploring a number of Greenfield and Brownfield opportunities.
Arrowis an integrated coal seam gas (CSG) company that explores and develops gas fields, produces and sells CSG and generates electricity.
Arrow is owned by a 50/50 joint venture partnership between Shell and PetroChina.
Number of work packages : 3
ASC is seeking suppliers, including Small to Medium Enterprises, to work to continue to deliver world benchmark capability.
Number of work packages : 3
In March 2019, the Australian Chief Information Officer Group (CIOG) awarded the JP9711-1 Core Simulation Capability to the Lockheed Martin Team. The award included an acquisition contract and a service contract. Scope includes: Transformation of extant simulation capabilities leveraging a combination of existing TLS products like WARSIM and EPIC with new purpose-built simulation management software. The Services portion of the contract begins following achievement of Initial Operational Capability (IOC) in December 2020. The LM Team provides a range of support for distributed training events including exercise planners, terrain developers, professional interactors, and simulation engineers.
Number of work packages : 3
The Australian Cyber Collaboration Centre is leading the creation and sustainability of Australia’s cyber community, creating solutions by championing collaboration, innovation, entrepreneurship and enterprise.
Number of work packages : 8
The Australian Defence Export Office (ADEO) was established in April 2018 as a key initiative of the 2018 Defence Export Strategy. The ADEO is the focal point for coordinating whole-of-government defence export support for Australian defence industry, to ensure it can meet Australia’s defence capability needs now and into the future.
Number of work packages : 7
Babcock is now seeking to broaden and deepen its supply chain to ensure we have the capability for supporting Australia’s Marine capability into the future.
Number of work packages : 1
BAE Systems Australia is seeking to partner with likeminded companies and the education sector on new skilling initiatives.
Number of work packages : 1
In response to the Australian Government’s Global Supply Chain initiative, BAE Systems Australia established the Global Access Program (GAP) in 2012. Through their team embedded across their international business units, GAP creates export opportunities for Australian companies within the supply chain of BAE Systems group and partner organisations.
Number of work packages : 123
BAE Systems have been selected as the preferred tenderer for the SEA 5000 Future Frigate Program. This program is now known as the Hunter Class Frigate Program.
Number of work packages : 10
BBI Group Pty Ltd (BBIG) is proposing an integrated port and rail system servicing mining operations in the central Pilbara region of Western Australia the Balla Balla Infrastructure Project (BBI Project).
Number of work packages : 1
Redevelopment
creating a new emergency department, a modernised acute mental health facility,
an intensive care unit, a women’s and children’s hub, an expanded critical care
‘hot floor’ and at least 100 additional beds.Redevelopment
creating a new emergency department, a modernised acute mental health facility,
an intensive care unit, a women’s and children’s hub, an expanded critical care
‘hot floor’ and at least 100 additional beds.
Number of work packages : 40
Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos Offshore Pty Ltd (Santos) as Operator and SK E&S Australia Pty Ltd.
Barossa Offshore > Barossa Offshore Project FPSO EPCI (MODEC)
Number of work packages : 79
Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos Offshore Pty Ltd (Santos) as Operator and SK E&S Australia Pty Ltd.
Number of work packages : 1
ICN Victoria has established this portal as a collective forum for all Barwon & Great South Coast Project Opportunities and information.
Number of work packages : 19
About the Project
The Otway Offshore Phase 5 project involves the further development of the Thylacine field and the potential development of the Artisan field, and comprises the following:
- Tie-In of up to four (4) Subsea Wells to the existing Thylacine-A platform;
- Potential tie-In of one (1) Subsea well to the Existing Otway Export Gas Pipeline.
The development will consist of procurement, fabrication and installation of flexible flowlines, subsea structures, electro-hydraulic umbilical systems and subsea control system upgrades on Thylacine-A Platform and Onshore Gas Plant.
Packages for this work will start being released on the ICN in Q4 2020 and will continue into 2021.
Number of work packages : 1
A new government office is coming to Bendigo being delivered by Regional Development Victoria in partnership with Development Victoria.
Number of work packages : 1
The Bendigo Law Courts Development Program will deliver a new Headquarter Court within the Bendigo CBD. This $152.4m Program will provide a much needed capacity uplift to the current disbursed six-courtroom facilities and will be vital for improving access to justice services as Bendigo's population continues to grow, also reducing pressure on courts in neighbouring regions.
Number of work packages : 1
The Bendigo TAFE City Campus will deliver an education precinct that will boost activity and vibrancy in Bendigo’s central business district, and invest in the future of regional Victoria.
Number of work packages : 2
BGIS Pty Ltd is proud to partner with the Industry Capability Network to offer opportunities to its national database of suppliers for the provision of facilities management services and minor works. Opportunities to join our supply base will be periodically published to the Gateway and we welcome your expressions of interest.
Number of work packages : 2
Brisbane Metro will be a key part of Brisbane’s greater transport network connecting the city to the suburbs. New high-capacity and high-frequency Metro services will run along dedicated busways and link with suburban bus and train services as part of a better-planned network.
Brisbane Metro will provide a 21-kilometre service connecting 18 stations from Eight Mile Plains to Roma Street, and Royal Brisbane and Women’s Hospital (RBWH) to University of Queensland (UQ).
The expected cost to build Brisbane Metro is $1.244 billion. Brisbane City Council (Council) has committed to funding a majority of the project’s capital costs, with the Australian Government providing a $300 million funding contribution to the project.
Number of work packages : 51
Caboolture hospital provides services to a rapidly growing region and population. There is a requirement to expand the breadth and depth of services available, to improve local access to services, better align the service profile with projected demand, and to provide improved environment for patients, families, and staff.
Number of work packages : 59
The Cairns Convention Centre is currently at capacity, due to a combination of population growth, increased tourism and demand for the number and increasing size of Trade shows. The Cairns Convention Centre Expansion Project (CCCE) has been proposed to meet the need of the growing venue demand in Cairns to host multiple trade shows and conventions.
The Department of Housing and Public Works (DHPW) is the project principal/client and Lendlease has been appointed as the managing contractor of the CCCE project which includes detailed design and construction responsibility.
Number of work packages : 20
The Canberra Hospital Expansion will transform the acute health services delivered at the Canberra Hospital. The new centre will deliver new Emergency Department treatment spaces, as well as additional Intensive Care Unit (ICU) beds, new pediatric ICU beds, a family support zone for families with children in the ICU, and new operating theatres including state-of-the-art hybrid theatres and interventional radiology theatres that support the most advanced medical technology.
Number of work packages : 105
The Operations packages include the operations and maintenance of the subsea, inlet processing, production, utilities and storage/offloading facilities; logistics; well construction and other Asset Development services; and Australia-wide contracts utilised for Major Capital Projects.
Visit Chevron website: www.chevronaustralia.com
Number of work packages : 17
The Clarke Creek Wind Farm project, is located approximately
150km north west of Rockhampton and 150km south of Mackay. The project is
currently in the feasibility phase and will comprise of up to 195 wind turbines
(over 800MW) located on the Broadsound Range.
Number of work packages : 83
The facility will produce three main products including nickel, cobalt, and scandium oxide
Number of work packages : 18
RATCH-Australia is developing the Collector Wind Farm Project in NSW. Project Approval for the Collector Wind Farm was granted on 2 December 2013, for the construciton and operation of 54 wind turbines, and associated infrastructure including a substation and transformers, underground cabling and overhead transmission connections, operations and maintenance facility and access tracks. EPC contract has been awarded to Vestas Wind Systems A/S.
Number of work packages : 62
Covalent Lithium is developing, and will operate, the Covalent Lithium Project which will include the construction and operation of a fully integrated mine, concentrator and refinery in Western Australia.
West Gate Tunnel > CPBJH JV - West Gate Tunnel Project
Number of work packages : 44
The West Gate Tunnel Project will deliver a vital alternative to the West Gate Bridge, providing a much needed second river crossing facilitating quicker and safer journeys. It will provide an alternative route from the West Gate Freeway to the CBD and will slash congestion and travel times.
Number of work packages : 15
Cross River Rail is a new 10.2 kilometre rail line from Dutton Park to Bowen Hills, which includes 5.9 kilometres of twin tunnels under the Brisbane River and the CBD.
Cross River Rail is a critical public transport infrastructure project which will improve our quality of life, help our economy keep growing, generate thousands of jobs and activate urban development, across the whole of South East Queensland.
Number of work packages : 1
The Metro Tunnel Project (Tunnels and Stations PPP) is an $11 billion dollar, multi-disciplinary, city shaping project that will help define the future of Melbourne. The Tunnels and Stations PPP includes the construction of twin 9km rail tunnels from Kensington to South Yarra as part of a new end to end Sunshine to Dandenong line and new underground stations at Arden, Parkville, CBD North (with a direct pedestrian connection with Melbourne Central station), CBD South (with a direct pedestrian connection with Flinders Street Station) and Domain.
Number of work packages : 2
The NT Government is establishing East Arm in Darwin as the prime location for marine maintenance and servicing facilities in northern Australia by building the largest ship lift in Northern Australia. The Ship Lift Facility will enable the maintenance and servicing of Defence and Australian Border Force vessels, along with commercial and private vessels, including from the oil, gas and marine industries.
Darwin Ship Lift and Marine Industry Project > Darwin Ship Lift - BESIX Watpac
Number of work packages : 1
The Northern Lift consortium has been shortlisted to deliver the Darwin Ship Lift. Led by Australian multidisciplinary construction contractor BESIX Watpac, Northern Lift consists of leading marine infrastructure specialists.
Darwin Ship Lift and Marine Industry Project > Darwin Ship Lift - McConnell Dowell
Number of work packages : 1
McConnell Dowell have been shortlisted for the Request for Proposal (RFP) stage of the Darwin Ship Lift Project.
Darwin Ship Lift and Marine Industry Project > Darwin Ship Lift - Sitzler
Number of work packages : 1
Local construction company Sitzler has been shortlisted through to the Request for Proposal (RFP) stage for planning and delivery of the proposed ship lift facility at East Arm, NT.
Darwin Ship Lift and Marine Industry Project > Darwin Ship Lift - Territoria Civil
Number of work packages : 1
Territoria Civil has been shortlisted to participate in the Request for Proposal [RFP] phase of the Darwin Ship Lift and Marine Industry Project tender.
Number of work packages : 11
The Defence Fuel Transformation Program (DFTP) aims to transform the Defence Fuel Supply Chain (DFSC) in order to deliver a safer, simpler and more assured Defence Fuel Network (DFN) in partnership with industry. The Fuel Services Contract (FSC) is one of the DFTP transformation projects.
Number of work packages : 17
CWP Renewables is developing the Bango Wind Farm project in NSW. Project Approval for the Bango Wind Farm was granted in December 2018 for the construction and operation of 46 wind turbines and associated infrastructure including a substation and transformers, underground and overhead cabling, operations and maintenance facility and access tracks. The EPC Contract has been awarded to General Electric International Inc. (GE).
Number of work packages : 5
The Dorado oil field contains 140 mmbbls (2C, 100%) of oil. It is located in the Bedout basin, approximately 150km north of Port Hedland in Petroleum permit WA-437-P. The project will be developed jointly in line with the equity split of Santos Offshore Pty Ltd 80% and Carnarvon Petroleum Pty Ltd 20%.
The offshore resource would be developed with up to 16 platform wells drilled by a jack-up drilling rig. These would be connected back to an adjacent Floating Production, Storage and Offloading facility (FPSO) moored in 95 metres of water above the Dorado field.
The proposed FPSO unit will have processing facilities to stabilise and store the oil and compress and re-inject gas to the reservoir.
Number of work packages : 19
East Rockingham Acciona Joint Venture, have, together with Hitachi Zosen Inova, formed the EPC Consortium to engineer, procure and construct the East Rockingham Waste to Energy Project,
Number of work packages : 1
Echuca in Victoria, and Moama in New South Wales are connected by a single Murray River Bridge which was built in 1878. This crossing provides an important link for local traffic between the two towns and surrounding regions.
Fortescue Metals Group > Eliwana Project
Number of work packages : 71
FMG Solomon, a subsidiary of Fortescue Metals Group, will develop the Eliwana Project, following board approval in May 2018.